The all-inclusive, load-bearing design of structural insulated panels (SIPs) offers an energy-efficient, quiet alternative to conventional wood framing methods. In recent years, SIPs have increasingly grown in popularity as builders strive to provide more durable products, use more environmentally sustainable building methods, and reduce costs. According to AMA Research, SIPs are now the fastest growing new building method on the market.
Information Portability for Construction
Written by Matt Ostanik, AIA, CSI, LEED AP Fri, Jul 02 2010Unlike many other industries, the construction industry is, by nature, required to be highly mobile and portable. In major commercial construction projects, hundreds or thousands of workers converge on a specific geographic location for a period of time lasting from a few months to a few years. Then, everything is packed up and relocated to a completely different location. Due to the dynamic nature of industry relationships and projects, many of the workers will actually be spreading their time across multiple job sites at any one time.
Ted Kokenos is a veteran construction cost estimator. He initiated a transition from pencil and paper cost estimating to computer-based while working for a construction company employing about 60 people. His experience might inspire some construction firms that have been thinking about making the leap to computer estimating to finally go for it!
I recently had the opportunity to visit Bing Thom’s much talked about and long-awaited Arena Stage renovation and expansion project in Washington, D.C. With slightly more than two years of construction completed, the $125 million, 200,000 square foot project is in the final stages and is due to open its doors on schedule for the inaugural 2010/11 theater season later this fall.
Consider This One Lucky Horseshoe: Renovated Ohio Stadium Gets Hunter Products
Written by Hunter Industries Wed, Jun 09 2010Ohio Stadium, home of the Ohio State Buckeyes, underwent a major renovation project (completed in 2001) that included the installation of a new Prescription Athletic Turf (PAT) playing field and a fully integrated irrigation system. Although the PAT playing field has since been replaced with field turf, the following case study courtesy of Hunter Industries provides good insight into the design and construction process.
Turn Smart Water Technologies Into Profit Opportunities
Written by Troy Leezy of Hunter Industries Thu, May 27 2010In challenging economic times such as these, we need to find new ways to create revenue. With increasing focus on water conservation and efficient irrigation practices come new opportunities. Whether it is simply offering product upgrades to current customers through the bid, or marketing to past customers with aging irrigation systems, a wide variety of efficient product solutions exist in the market today. Many of the new products available today do not require much or any effort above and beyond traditional installation practices and offer your customers a reasonable timeframe for return on investment.
Construction of the Vancouver Convention Centre's Habitat Skirt
Written by WorleyParsons Canada Ltd. Fri, May 21 2010The Vancouver Convention Centre, which was featured on the Go Green channel as a case study in April, has an extremely unique design feature – an artificial reef (also referred to as a “habitat skirt”). The concrete habitat skirt steps down in five tiers from the underside of the public walkway into the harbor. The skirt was designed with input from marine biologists and other consultants to make it mimic a natural environment.
Recently, I had the opportunity to observe firsthand the installation of an underground water storage tank for the purpose of fire-fighting in rural western Howard County, Maryland. An underground water storage tank can serve as a water source for firefighters in an area where hydrants connected to water mains are either unavailable or located at great distances from each other. Underground water storage tanks provide greater fire safety, are more compact and visually unobtrusive when compared to aboveground models, and could represent cost savings to local government agencies as well as homeowners.
Demolition projects can range from small, simple jobs to complicated undertakings that require sophisticated and detailed planning. Site conditions can vary significantly, and there is always a degree of imprecision to the wrecking of the building itself. For typical building demolition and site improvements the most common procedure is to use heavy mechanical equipment such as wrecking balls, excavation hoes, grapples, pulverizers, crushers, and hydraulic breakers and shears. Several factors need to be considered prior to and during demolition, including the scheduling of demolition activities, protecting the site (especially important with occupied structures), and dealing with hazardous materials.
For New-Construction Clean-Down of Contemporary Masonry Buildings
Cleaning today’s relatively new concrete masonries, like simulated stone and concrete brick, is different from cleaning clay masonry. Clay masonry can usually withstand the more aggressive cleaners needed to dissolve hardened mortar smears. But even clay masonries now vary enough in type to take particular procedures and products.
I learned a hard lesson regarding the required use of spreader bars when lifting heavy angular objects with a crane: I was placed in harm’s way and witnessed the destruction of over $20,000 worth of property during a construction mishap. Fortunately, following some tense seconds, there were zero injuries and several lessons learned.
Planning and Best Practices
The light gauge metal stud framing phase of a project significantly impacts several other trades. It is no secret that good planning and practices will achieve higher production rates and a level of quality that meets the project's specifications. Planning and layout should be the responsibility of the project foreman; however, everyone should be involved with preparing the work flow. While actual layout is underway, other production items should also be thought through.