Electronic vs. Verbal Communication

Written by

Advancements in technology have revolutionized the way we do business, but we must not lose sight of the benefits of personal interaction. I find myself getting more and more email every day and having less time to actually talk to or even see the people I am working with. I am probably more guilty of this then many because I am what you might call a “satellite” project manager,  working remotely on out-of-town jobs.

Return to Planet Earth: Building a Sustainable Brewery

Written by

When it comes to sustainability in the craft brewing industry, more often than not the focus is on ingredients. Organic and sustainable hops and malts are old news at this point and are considered by most people to be good practice rather than true sustainability. Some breweries, however, have taken the concept of sustainability and applied it not only to their products but to their build-outs and operational models. Spearheading this movement toward greener building for craft breweries is Mother Earth Brewing in Kinston, North Carolina.

Going Green: Energy Options

Written by

The things that help a building use the least possible amount of electricity and natural gas are central to what makes it green. Making an existing structure more energy-efficient can be done in broad strokes or with baby steps.

Seismic Retrofit Lessons Learned: Contractual and Planning

Written by

The project was a seismic retrofit of a 15-story building constructed in 1991. The steel portion of the project consisted of systematically strengthening the moment connections throughout the building and installing over 200 dampers in a 750,000 sq. ft. office building without interrupting the operation of the tenants. The contract dictated that the work would start in the basement, progress through the ground floor and the parking garage (floors 2-5), and then continue through the occupied office floors (6-15). The contractor could only occupy three half floors at any one time and a set number of parking spaces due to contract restrictions. The contract also restricted work hours, noise levels, and delivery times. These restrictions would drive the pace of the work.

Residential Zoning: Ask the Right Questions

Written by

Homeowners wanting to add to or renovate their properties need to know the right questions to ask. Contacting your city zoning office before starting work to obtain a building permit and to verify that the project is permitted under the current zoning ordinances will get you started on the right foot. Understanding property set-back issues and backyard space rules will also help ensure a successful project.

Pre-Design Zoning Questions Critical to Success

Written by

Ignoring certain zoning matters during the critical opening stages of your building or development project can be devastating. Property set-back issues and future land-use studies can be roadblocks or temporary stumbling points on the way to success. Whether you are building on commercial, residential, or industrial property, it is essential that you ask the right questions. The answers can make or break your project.

Considerations for Building Green

Written by

A growing number of people have become aware of and even begun to measure their personal, ecological footprint on the planet. Others are concerned about healthy living and working spaces free of toxins. Some people simply see greening their properties as an effective cost-cutting measure or wise investment.

Main Street Bridge Adds Aesthetic Appeal to Columbus Skyline

Written by

Since 2000, the City of Columbus has been proactively embarking on the revitalization of the Downtown area, including the renovation of several office buildings, as well as the construction of new condominiums and an amphitheatre. The Downtown Columbus skyline will soon be changing again due to the addition of a revolutionary design structure—the new Main Street Bridge. The bridge that previously stood in its place, running along the Scioto River, was closed in 2002 due to deterioration, 65 years after it opened in 1937. Construction, which was initially scheduled to be completed in June 2009, is now scheduled to be completed this August.

Fertilizer 101

Written by

Beekman Tower: Gehry's Downtown Skyscraper

Written by

Frank Gehry's second architectural venture into New York City is also his tallest building yet. Spiraling 76 stories and enveloping 1.1 million square feet, Beekman Tower dominates the nearby Woolworth building in downtown Manhattan. Under construction since 2006, the newest addition to the city's distinct skyline is expected to open early next year, and it proves that Gehry's signature, sculptural vocabulary translates successfully into skyscraper form.

IPD and IPC – The Perfect Marriage for Faster Projects

Written by

Speed matters. That is a fundamental fact of the construction business. In my years as an architect, I don’t recall ever meeting a single client who said, “It doesn’t matter when my building gets completed.” Every project has deadlines, and every deadline is important. If the owner is financing the work through a construction loan, then the faster the building is completed, the sooner they can complete the loan. If the owner is a school district or an expanding business, then there may be hard deadlines that must be met, such as the day that the new school needs to be open for students or when the business owner needs the space for additional equipment or employees.