AEC Pros

U.S. Wastewater Infrastructure: Funding Issues and Aging Systems

Written by

Wastewater systems is the sixth topic in our U.S. infrastructure series. The American Society of Civil Engineers (ASCE) assigned the United States’ WASTEWATER infrastructure a grade of “D-” on their 2009 Report Card for America’s Infrastructure. Here we explore the funding issues that effect the aging treatment plants and waterways that make up our nation's wastewater infrastructure.

Patrick Blanc’s Vertical Garden in Madrid

Written by

There are two common sayings about Madrid -- “Madrid me mata” ("Madrid kills me") and “De Madrid al cielo” ("From Madrid to Heaven"). Both adages are appropriate ways to describe Madrid’s polarization between the calm and the chaotic. From the city’s breakneck traffic to its streets filled with animated Madrileños, rosemary-laden gypsies, and gawking tourists, the city of Madrid moves at a nauseating rhythm. Somewhere, deep within this traditional chaos, it’s possible to find hidden corners of both modernization and tranquility. Strolling along the Paseo de Prado’s tree-lined avenue, you will come across Patrick Blanc’s vertical garden lurking in one of these corners.

Zaha Hadid’s Cincinnati Contemporary Arts Center

Written by

At first glance, Cincinnati, Ohio, appears to be a typical Midwestern city. A closer look reveals a sophisticated community of architectural trendsetters. Beginning in large part with a transformative vision for the University of Cincinnati campus in the late 1980s, Cincinnati is now home to a major concentration of signature contemporary architecture. One of the architectural treasures of Cincinnati is the Lois & Richard Rosenthal Center for Contemporary Art, home of the Contemporary Arts Center (CAC). Designed by Pritzker Prize award winner Zaha Hadid and opened in 2003, the Rosenthal Center for Contemporary Art allows CAC to serve its organizational mission to unite art and people in a provocative architectural environment.

Foreign Office Architects’ MOCA Cleveland

Written by

Recently unveiled are plans for a new building to house the Museum of Contemporary Art Cleveland (MOCA Cleveland). London-based Foreign Office Architects (FOA) is the design firm for the project, and Westlake Reed Leskosky acted as the architect of record. Currently the museum is tucked away on the second story of the Cleveland Play House complex; the new facility will give MOCA Cleveland 44% more space as well as a commanding presence at a prominent intersection in University Circle.

Contract Administration and Closeout

Written by

Ninety-nine percent of construction work is completed within the allotted time. Getting a project closed out -- the other one percent -- seems to take just as much time. Why does this process take so long? A seemingly endless series of punch list and paperwork items must be completed before the project can be considered complete.

LEED Certification ROI

Written by

For more than ten years now the United States Green Building Council (USGBC) has been transforming the way we build through its Leadership in Energy and Environmental Design (LEED) rating system. This transformation has been driven by local, state, and federal government, as well as institutions. However, the past two years have seen an increasing number of private LEED projects; this trend has sparked interest in the return on investment (ROI) of LEED certification.

Getting Paid: Contract Administration and the Payment Process

Written by

Late payment to the contractor is one of the main causes of relationships souring during construction projects. The contractor is unhappy. Subcontractors are unhappy. Suppliers are unhappy. The engineer has to field all of these complaints -- and often the blame. Incomplete payments, due to disputed work or progress, lead to damaged relationships as well. Late payments do more than effect relationships, however: They can severely cripple a contractor’s ability to continue and complete the work.

Biblical Proportions: The Sukkah, Reimagined

Written by

New York City's lively Union Square is known for its green market, but it is briefly playing host to another set of organic structures -- an ephemeral village of sukkahs. Sukkot, the seven-day-long Jewish holiday, is celebrated by building these temporary forms, reminiscent of those that the Israelites inhabited in the wilderness after their exodus from Egypt.

LEED Third Party Verification: Project Certification and Professional Credentials

Written by

Third-party verification, the basic concept at the heart of the Leadership in Energy and Environmental Design (LEED) program, is both its greatest strength and its greatest burden. The U.S. Green Building Council (USGBC) has long struggled to establish a practical system in which a series of independent verifiers work seamlessly together to achieve building certification.

SANAA’s New Museum: Grit and Glamour on the Bowery

Written by

The New Museum is not exactly new anymore. Upon its completion in 2007, the blocky, mesh-clad structure generated some controversy: a rainbow-hued "Hell Yes!" affixed to its facade rebelliously declared its arrival on the Bowery, the main street of the eponymous neighborhood in lower Manhattan. SANAA's eye-catching design for the the 33-year old New Museum oscillates between the Bowery's infamous past and its inevitably gentrified future.

Relationships and Contract Administration

Written by

Construction is about building, and not only in the sense of infrastructure: building professional and cordial relationships between the three principals on a project results in a better facility constructed on time and within budget. The relationships between the owner (or developer), the contractor, and the engineer (or other design professional) are defined by the General Conditions of the Construction Contract, published by the Engineers Joint Contract Documents Committee (EJCDC).